Oil & Gas
- Projects
- Projects Signature
- O&G EXperience
UPGRADING LPG PLANT 1-2-3 PROJECT
Tecnoconsult developed the services for upgrading the fractionation capacity at liquefied petroleum gas plants 1, 2 and 3 at ULE LPG complex
Plant 1: Adapting and changing operating conditions in the depropanizer and debutanizer sections , installing a new condenser, replacing reversible flow pumps, taking out existing coolers, modifying trays in the depropanizer tower, adapting the relief and instrumentation system, adapting the motor control centers, and replacing power transformers.
Plant 2: Adapting and changing operating conditions in the depropanizer and debutanizer sections, installing a new condenser, replacing reversible flow pumps, modifying instrument loops, adapting the plant’s relief and instrumentation system, and adapting the motor control center
Plant GLP-3: Adapting and changing operating conditions in the depropanizer and debutanizer sections and replacing the depropanizer tower.
Location:
Zulia State, Venezuela
Client:
PDVSA
Scope:
Engineering, Procurement and Construction Management

