HAMACA PROJECT PACKAGED

The Hamaca Upstream Facilities Project – Package D encompassed all the required work to increase the capacity to process and ship to Jose about 190,000 BOPSD of extra heavy crude, combined with about 56,500 BOPSD diluent, after removal of about 33 MMSCFSD of associated gas and up to about 19,000 BPWSD of produced water. The new facilities included modifications within Centro Operativo Bare (COB) in order to provide the necessary additional gas and water removal, including treating facilities. The scope of the services also included a diluents pump station at Palmichal with a metering and transferring station to batch diluents to two different pipelines at PTO.

Location:

Venezuela

Client:

Petrolera Ameriven (Chevron Texaco, PDVSA)

Scope:

Engineering, Procurement